David, John,

Update Opportunity List
Due Date Last Entry Owner
03/24/2007 02/22/2007 David Jones
Review the opportunity list for needed updates (i.e. progress), and make those changes.

Previous Update Opportunity List
02/22/2007 - Update Opportunity List
x

David, please complete the task here:

1.
Update Opportunity List
2.
Mark as Complete
or
Enter Comments and Mark as Complete

Saving Opportunities:
Name Annual Savings($) Employee Completion Date Notes Progress Last Updated
Change electric rate to PLM Rate $11,160 3/9/2007 The current rate is not the cheapest rate due to reduced operations there. Changing to this rate should cost nothing, and save about 8% ($780) off your bill, plus another $150 administrative cost savings. 50% 3/6/2007
Shut off lighting outside of shift times $12,000 The savings figure represents all the lighting in the Church st. facility, other than security lighting. Currently, it is being left on all night, which can easily be corrected.

2/23/07 - Rick and David will review which lights can be shut down at night.
25% 3/7/2007
Use Backup Air Compressor during 2nd shift $5,400 The compressed air demand is significantly smaller during the 2nd shift. Switching to the backup air compressor for the 2nd shift will use less energy, and spread the runtime across both machines.

0% 3/24/2007
$47,960