Rick, David, Bo, John,
Monthly Energy Report| Due Date | Last Entry | Owner |
| 03/24/2007 | 02/22/2007 | John Bracey |
John, please complete the task here:
| 1. | ||
| 2. |
Your Facility Report - Cost
and Consumption
| Facility | Bill | Total Cost | Excess Cost | Excess % | Natural Resource Usage | C02 (lbs) |
| Church Street | Electric Bill - 3/26/2007 | $9,259 | $0 | N/A | 67,030 lbs Coal | 127,752 |
![]() |
||||||
| Status | Task | Due Date | Last Entry - Click to View | Owner |
| Enter Electric Bill | 4/25/2007 | 3/26/2007 | John Bracey | |
| Monthly Energy Report | 3/24/2007 | 2/22/2007 | John Bracey | |
| Update Opportunity List | 3/24/2007 | 2/22/2007 | David Kohlmaier |
Saving Opportunities:
| Name | Annual Savings($) | Employee | Completion Date | Notes | Progress | Last Updated |
| Change electric rate to PLM Rate | $11,160 | 3/9/2007 | The current rate is not the cheapest rate due to reduced operations there. Changing to this rate should cost nothing, and save about 8% ($780) off your bill, plus another $150 administrative cost savings. | 50% | 3/6/2007 | |
| Shut off lighting outside of shift times | $12,000 | The savings figure represents all the lighting in the Church st. facility,
other than security lighting. Currently, it is being left on all night,
which can easily be corrected. 2/23/07 - Rick and David will review which lights can be shut down at night. |
25% | 3/7/2007 | ||
| Use Backup Air Compressor during 2nd shift | $5,400 | The compressed air demand is significantly smaller during the 2nd shift.
Switching to the backup air compressor for the 2nd shift will use less energy,
and spread the runtime across both machines. |
0% | 3/24/2007 | ||
| $47,960 |
----------------------------------------------------------